News and Music Discovery
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Mayfield Creek Bridge Plans

Kentucky Transportation Cabinet officials say bidding for building contracts for a new Mayfield Creek KY 1241 Leeder Bottom bridge could begin as soon as April. KYTC Engineers say the project is in the final design phase. Inspectors closed the bridge last April after floods damaged a pier. And the bridge collapsed in June before repair plans could be formulated. Engineers believe if everything stays on schedule and plans are approved as developed, construction on a new bridge could start sometime in June, and it could be opened to traffic raising the likelihood by the end of the year.

Gary Pitts is a music loving outdoorsman who coincidentally loves outdoor music. He is a student at Murray State pursuing a music minor to complement his history major. Gary is a member of the MSU Guitar Ensemble and greatly enjoys the Latin grooves he and the other ensemble members get throw down on. When he is not producing news, jamming on his guitar, or pursuing music history research, he is usually canoeing or biking somewhere in nature with his wife Siobian.
Related Content